Kohler Freewill Barier Free Bath Whirlpools K-12106-H Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Wasserausrüstung Kohler Freewill Barier Free Bath Whirlpools K-12106-H herunter. Kohler Freewill Barier Free Bath Whirlpools K-12106-H User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - K-12105-H* K-12106-H*

Freewill Barrier Free Bath Whirlpools:K-12105-H* K-12106-H*115982-2-BA (-)1999 Kohler Co.

Seite 2 - SAVE THESE INSTRUCTIONS

10115982-2-BA (-)Kohler Co., Kohler, WI 7. INSTALL THE WHIRLPOOLA. WHIRLPOOL SET-IN1. Lay out and mark the supply or mixing valve holelocations on th

Seite 3 - INTRODUCTION

11115982-2-BA (-)Kohler Co., Kohler, WIB. PUMP BANDING STRAP CUTNOTICE: This step is necessary to make yourKohler whirlpool operate more quietly.1. U

Seite 4

12115982-2-BA (-)Kohler Co., Kohler, WI 8. ELECTRICAL CONNECTIONSA. IDENTIFY ELECTRICAL REQUIREMENTSThe model number is printed on a label at the pum

Seite 5 - 3. PRODUCT REQUIREMENTS

13115982-2-BA (-)Kohler Co., Kohler, WI 10. COMPLETE FINISH WALLInstall water-resistant wall material for either flush oralcove installation as follow

Seite 6 - 4. INSTALLATION REQUIREMENTS

14115982-2-BA (-)Kohler Co., Kohler, WID. INSTALL SHOWER RODThe shower rod, if used, should now be installed.Position the shower rod so the shower cu

Seite 7 - 5. SITE REQUIREMENTS

15115982-2-BA (-)Kohler Co., Kohler, WIB. OPERATING SEQUENCERefer to the chart at right for the proper operatingsequence.1. Turn on the whirlpool jet

Seite 8

16115982-2-BA (-)Kohler Co., Kohler, WIB. TROUBLESHOOT WHIRLPOOL SYSTEMThis troubleshooting guide is for general aid only. A Kohler Authorized Service

Seite 9 - 6. BEFORE INSTALLING UNIT

Kohler Co., Kohler, WI115982-2-BA (-)2IMPORTANT SAFETY INSTRUCTIONSATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK OF FIRE, ELECTRICSHOCK, OR INJ

Seite 10 - 7. INSTALL THE WHIRLPOOL

3115982-2-BA (-)Kohler Co., Kohler, WITABLE OF CONTENTSIMPORTANT SAFETY INSTRUCTIONS 2. . . . . . . . INTRODUCTION 3. . . . . . . . . . . . . . . . .

Seite 11 - C. INSTALL PLUMBING

*64-3/4”56”18”13”37”7/8”ELBOWSUPPLY4”3/4”2-7/8”1-1/2” O. D.CL SPOUT3”19”*84”3”1-5/16”9”5” 20”4”PUMP/CONTROL ACCESS4115982-2-BA (-)Kohler Co., Kohler,

Seite 12 - 8. ELECTRICAL CONNECTIONS

5115982-2-BA (-)Kohler Co., Kohler, WI 2. PRODUCT NOTICESA. INSTALLER HAZARD NOTIFICATIONDANGER: Risk of fire, electric shock, or injuryto persons. Re

Seite 13 - 11. COMPLETE INSTALLATION

6115982-2-BA (-)Kohler Co., Kohler, WIE. ELECTRICAL REQUIREMENTSThe installation must have a Class A Ground-FaultCircuit-Interrupter (GFCI). The GFCI

Seite 14 - 13. CONFIRM PROPER OPERATION

7115982-2-BA (-)Kohler Co., Kohler, WI 5. SITE REQUIREMENTSA. OLD BATH REMOVALDisconnect the drain at the trap. Remove the old wallmaterial. Slip boa

Seite 15 - B. OPERATING SEQUENCE

8115982-2-BA (-)Kohler Co., Kohler, WID. PLUMBING ACCESS CONSIDERATIONSBecause this is a one-piece unit, the drain and overflowconnections cannot be

Seite 16

9115982-2-BA (-)Kohler Co., Kohler, WIF. STUD POCKET PREPARATIONConstruct a minimum 2x4 recess designed for yourparticular installation. Make sure yo

Kommentare zu diesen Handbüchern

Keine Kommentare