Kohler K-15136-S-PB Installationsanleitung Seite 2

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 1
Tools and Materials
Before You Begin
Observe all local plumbing and building codes.
Shut off the main water supply.
1. Prepare the Site
IMPORTANT! Secure the piping to the framing.
Install or relocate the water supplies as necessary.
NOTE: A typical bath and shower installation uses 1/2 copper
tubing and adapters.
Use thread sealant on all threaded connections.
Temporarily install 1/2 nipples to the bath and shower elbows,
extending at least 2 (51 mm) beyond the finished wall.
Turn on the water supply and check for leaks.
Complete the finished wall.
Plumbers
Putty
Thread
Sealant
Adjustable
Wrenches
Strap
Wrench
Plus:
• Emery Paper
5/32"
1011610-2-C 2 Kohler Co.
Seitenansicht 1
1 2 3 4 5 6 7 ... 11 12

Kommentare zu diesen Handbüchern

Keine Kommentare