Kohler K-2229-0 Installationsanleitung Seite 2

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 4
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 1
112022-2-AA (A) 2 Kohler Co., Kohler, WI
INSTALLATION
MARK DESIRED LOCATION
Position shelf on wall at desired location. Place spirit level
on top surface and level the shelf. See Fig. #2 .
Fig. #2
With shelf in place, mark the location of the mounting
holes with a pencil. Remove shelf from wall. See
Fig. #3 .
Fig. #3
DRILL PILOT HOLES
Drill 1/8” pilot hole at each marked location. If wall stud
is drilled, use screw and washer in place of toggle anchor
for mounting. If wall stud is not drilled, a 1/2” hole for
installation of toggle anchor is needed.
INSTALL TOGGLE ANCHOR
Fold back metal toggle flat alongside the plastic straps.
Insert metal toggle anchor into the hole. See Fig. #4 .
Fig. #4
Toggle Anchor
Metal
Toggle
Pull ring and push cap to wall and snap off straps. See
Fig. #5 .
Fig. #5
Cap
Seitenansicht 1
1 2 3 4

Kommentare zu diesen Handbüchern

Keine Kommentare