Kohler K-705810-L-ABV Installationsanleitung Seite 15

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 60
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 14
11. Secure the Header
Steam Door
From inside the shower, hold the header down while sliding the header expander up to the ceiling.
Using the pre-drilled holes in the wall jambs as guides, drill through the header and expander using
a 1/8 drill bit.
Secure the header in place using two #8 x 3/4 flathead screws.
Non-Steam Door
From inside the shower, press the header expander fully into the header.
Using the pre-drilled holes in the wall jambs as guides, drill through the header and expander using
a 1/8 drill bit.
Secure the header in place using two #8 x 3/4 flathead screws.
Screw
Header
Inside of
Shower
Kohler Co. 15 1144162-2-B
Seitenansicht 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 59 60

Kommentare zu diesen Handbüchern

Keine Kommentare